This hotel industry is looking for more environmentally friendly ways to operate.
One of Bacolod’s hotels is struggling to reduce its monthly electricity bill, which is estimated to be Php 500,000. Skybright Solar was approached personally by the owner about this matter.

As a solution, we recommended a 20kW grid-tie system. This system is best suited for customers who have stable grid power and experience few power outages. A 20KW system would save them Php 399,000 per year ( as CENECO-utility, prices increase annually).

We recommended ABB inverters for this installation due to their proven high efficiency and performance in large-scale installations. We also used Hanwha Q-Cells Solar Panels with 6-busbar technology and excellent performance.

The hotel will have the following features with the equipment and proposed system:

Return on Investment of 3.3 years

Savings of Php 399,000 per year (as CENECO prices increase annually)

Guaranteed additional cost savings (with no extra equipment maintenance costs over 6.7 years)

Bottom line profits of Php 2.6 million

PROJECT SIZE

20KW 3-Phase Grid Tie System

DATE

– 20191105

LOCATION

– Bacolod City

All values were well studied and researched by our Solar expert Engineers and Electricians.

equipments

EQUIPMENT USED

INVERTERS

Brand: ABB
Size: 20KW

RAILINGS

Brand: Hopergy
Number of Railings: 36

SOLAR PANELS

Brand: Hanwha Q CELLS
Size: 330W – Poly-Crystalline Solar Panel
Number of Panels: 72